Town Administrator: Mark B. Walter
Hop River Road Bridge Replacement Project Detour in Effect from April 1, 2024 to December 2024
Hop River Road Detour in effect from April-December 2024 during bridge replacement
Motorists are advised that required project detour of Hop River Road is on schedule to begin on April 1, 2024, allowing for the eventual opening of the bridge to vehicular traffic by the end of the 2024 construction season (December).